Project name: No. 2 Plant of Kunshan Huatian Clean Room Decoration Project, and Mechanical and Electrical Installation Engineering of No.3 Power plant.
Engineering site: No. 112, Longteng Road, Economic-Technological Development Zone, Kunshan
Construction unit: HuaTian Technology(Kunshan)Electronics Co., Ltd.
Construction area: 37,212 m2
Building storey: 1 floor under the ground and 3 floors above the ground; Building height: 25 m
Structure type: reinforced concrete and frame-shear wall stiffness structure
Commencement date: December 30, 2003
Completion date: October 6, 2005
Awards: Huatian Technology Prime Quality Engineering Award

News
- Data-Driven, Building a Smart Future | L&K Wins First Prize at the 2025 Digital Engineering Project Management Competition (Data 2026年05月21日
- L&K’s Shenzhen Hook-up Project Awarded “Excellent Supplier” by Client 2026年05月19日
- A Professional Prelude to L&K’s 2025 Nomograph Counting Competition 2025年12月08日
- Excellence Forged in Craftsmanship, Propelled by Honor 2025年10月13日