| | English

Harbin Shunmai Hospital Co., Ltd

date:2018-01-26    browser:131
Construction period: July 2009~August 2011
Total floor area: 120,000 m2
Structure type: frame-shear/17 floors, 1 floor under the ground
Design unit: The Architectural Design and Research Institute of HIT
General contractor unit: Dalian Jianke Construction Engineering Co., Ltd.
 

Foucs

Copyright © 2018 by lkeng. All rights reserved. 苏ICP备17037805号-1 Tel 86-512-67027000